
DAT-LINE (Data Line)
Issue 5 October 2002
979
555-233-119
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. By clearing error codes associated with the Digital Loop
Around Test, for example, you may also clear errors generated from other tests in
the testing sequence.
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the selected
time slot and never crosses over to time slots reserved for other connections. If
the NPE is not working correctly, one-way and noisy connections may be
observed. This test is usually part of a port’s Long Test Sequence and takes about
20 to 30 seconds to complete.
Order of Investigation
Short Test
Sequence
Long Test
Sequence
D/ND
1
1.
D = Destructive; ND = Nondestructive
Digital Loop Around Test (#171)
X
X
ND
NPE Crosstalk Test (#6)
X
ND
Conference Circuit Test (#7)
X
ND
Audit Update Test (#36)
X
X
ND
Table 180.
TEST #6 NPE Crosstalk Test
Error
Code
Test
Result
Description/Recommendation
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000
ABORT
System resources required to run this test are not available. The port may
be in use on a valid call. Use status data-module to determine when the
port is available for testing.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1001
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page