
PE-BCHL (PRI Endpoint Port)
Issue 5 October 2002
1449
555-233-119
Audit and Update Test (#36)
This test sends port level translation data from the switch processor to the UDS1
interface circuit pack to ensure that the port’s translation is correct. The port audit
operation verifies the consistency of the current state of the port that is kept in the
UDS1 interface circuit pack and in the switch software.
Table 383.
TEST #36 Audit and Update Test
Error
Code
Test
Result
Description/Recommendation
ABORT
Internal system error
2000
ABORT
Response to the test request was not received within the allowable time
period.
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
FAIL
The test failed due to Internal system error.
1. Retry the command at 1-minute intervals a maximum of 5 times.
PASS
The port translation has been updated successfully. The current port states
kept in the UDS1 interface circuit pack and in the switch software are
consistent. If the port is busied out, the test does not run, but returns PASS.
To verify that the port is in-service:
1. Enter status pri-endpoint <extension> to verify that the port is
in-service. If the port is in-service, no further action is necessary. If the
port is out-of-service, go to Step 2.
2. Enter the release pri-endpoint <extension> command or the release
port <PCSSpp> command to put the port back into in-service.
3. Retry the test command.
Continued on next page