
Maintenance Objects
555-233-119
642
Issue 5 October 2002
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. By clearing error codes associated with the Battery Feed
Test, for example, you may also clear errors generated from other tests in the
testing sequence.
NPE Crosstalk Test (#6)
This test verifies that this port’s NPE channel talks on the selected time slot and
never crosses over to time slots reserved for other connections. If the NPE is not
working correctly, one-way and noisy connections may be observed. This test is
usually part of the long test sequence and takes about 20 to 30 seconds to
complete.
Order of Investigation
Short Test
Sequence
Long Test
Sequence
D/ND
1
1.
D = Destructive; ND = Nondestructive
Battery Feed Test (#35)
X
X
ND
Station Present Test (#48)
X
X
ND
Looparound Test (#161)
X
ND
Conference Test (#7)
X
ND
NPE Crosstalk Test (#6)
X
ND
Station Status and Translation Audits and Updates
Test (#36)
X
X
ND
Table 38. TEST #6 NPE Crosstalk Test
Error
Code
Test
Result
Description/Recommendation
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page