Configuration
5-40
7SA6 Manual
C53000-G1176-C156-2
Figure 5-34
Establishing the
task level
Within the Run Sequence menu, select
Edit
, and then
Predecessor for In-
stallation
, to ensure that the function modules selected from the library will be im-
plemented into the desired task level (Figure 5-35).
Figure 5-35
Assignment of function modules to the selected
task level
The proper assignment is important for several reasons. For example, if interlocking
logic were to be set up in the measured values task level, indications would constantly
be created by the cyclical processing, filling the buffer unnecessarily. On the other
hand, the interlocking condition at the moment of a switching operation may not be
processed at the right time, since measured value processing is done cyclically every
600 ms.
Table 5-4
Selection guide for function modules and
task level
s
Function Modules
Description
Run-Time Level
MW_BEARB
Meter processing
PLC1_BEARB
Slow PLC
PLC_BEARB
Fast PLC
SFS_BEARB
Interlocking
ABSVALUE
Magnitude calculation
X
–
–
–
AND
AND-gate
–
X
X
X
BOOL_TO_CO
Boolean to control, conver-
sion
–
X
X
–
BOOL_TO_DI
Boolean to double point,
conversion
–
X
X
X
BOOL_TO_IC
Boolean to internal single
point, conversion
X
X
X
BUILD_DI
Create double point
annunciation
–
X
X
X
Summary of Contents for siprotec 7SA6
Page 2: ...Siemens Aktiengesellschaft Book No C53000 G1176 C156 2 ...
Page 18: ...xviii 7SA6 Manual C53000 G1176 C156 2 ...
Page 32: ...Introduction 1 14 7SA6 Manual C53000 G1176 C156 2 ...
Page 82: ...Hardware and Connections 2 50 7SA6 Manual C53000 G1176 C156 2 ...
Page 119: ...SIPROTEC 4 Devices 4 25 7SA6 Manual C53000 G1176 C156 2 Figure 4 20 CFC Logic example ...
Page 190: ...Configuration 5 62 7SA6 Manual C53000 G1176 C156 2 ...
Page 652: ...Installation and Commissioning 8 78 7SA6 Manual C53000 G1176 C156 2 ...
Page 724: ...Technical Data 10 56 7SA6 Manual C53000 G1176 C156 ...
Page 800: ...Appendix A 76 7SA6 Manual C53000 G1176 C156 2 ...
Page 866: ...Appendix B 66 7SA6 Manual C53000 G1176 C156 2 ...