(8) Sample injection (INJECT switch)
Switch the injection valve to the INJECT side to load the
sample into the flow path.
Move the syringe to the top dead point after switching the
injection valve.
Buffer tube
Refer to 2.3.3 Sample Injection Procedure, Cut Injection Method
Procedure (9) to (12) for completion of the analysis after this
operation.
Syringe valve
Syringe
Wash pump
5
1
3
2
4
Plunger
wash
Sample
Rack
P
Needle
Injection valve
Injection port
5
4
3
2
1
6
Loop
Wash
fluid2
Wash
fluid1
Waste
solution
Waste
solution
Wash port
From Pump To Column
Degassing
unit
3-way solenoid valve
2 - 43
Summary of Contents for CHROMASTER 5160
Page 244: ......
Page 406: ......
Page 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Page 1016: ......