background image

 
 
 
 
 
 

 
 
 
 
 
 

 
 
 

 

COMPONENTS 

Leg Bar Assemblies 

16 

Horizontal Support Bars 

Tank Liner with 3” Flange Cap 

Field Carry Bag 

Ground Cover (Optional) 

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

CUSTOMER SUPPORT 

1-800-971-7201 

Monday – Friday, 7am-330pm Pacific Time 

INSTRUCTION MANUAL 

 
 

 

1.  Remove Tank Liner from field bag and 

place in location to be assembled. 
Partially unfold Tank Liner until you see 
the outline of the body of the Tank Liner. 

2.  Place the eight (8) Leg Bar assemblies 

at each of the corners of the Liner with 
the arrows pointing outward. 

3.  Place a pair (2) of upper and lower 

Support Bars between the Leg Bars and 
end-to-end around the Liner. 

4.  Hold the Leg Bar assembly upright with 

the arrow pointing up.  Connect the 
lower Horizontal Support Bar to the 
bottom of the Leg Bar Corner Block by 
depressing the push button on the block 
and pushing the Support Bar on the 
Block until the push button “clicks’ into 
the locked position. 

5.  Repeat connecting the lower Horizontal 

Support Bars until all eight sides form 
the complete base frame. 

6.  Locate the Tank Liner corners and align 

with the Leg Bar assemblies.  While 
holding the top edge of the Tank Liner, 
slide the upper Horizontal Support Bar 
into the Liner Support Pocket. 

7.  Slide the Support Bar completely 

through the two (2) Support Pockets. 

8.  Connect the upper Horizontal Support 

Bar to the top of the Leg Bar Corner 
Block by depressing the push button on 
the block and pushing the Support Bar 
on the Block until the push button 
“clicks’ into the locked position. 

9.  Repeat connecting the upper Horizontal 

Support Bars until all eight sides form 
the completed SNAPTANK frame. 

 

Step-by-Step Assembly Instructions

Reviews: