4 - 2
4.1.2 Preparing the System for Operation
(1) Fig. 4-1 shows how to connect the units for performance
check. According to this figure, carry out tubing.
Before energizing the system, ensure that the tubing
between the autosampler and pump/detector is properly
connected.
Fig. 4-1 Flow Path Diagram
(2) Connect the e-Line cable among the autosampler, detector
and pump.
(3) Check if the drain tube is properly connected to the waste
solution bottle. The waste solution bottle must be at a
lower position than the autosampler.
Detector
Load resistance coil
(Injection valve)
(Syringe valve)
Autosampler
Pump
Mobile
phase
Waste bottle
Wash
liquid
Summary of Contents for CHROMASTER 5160
Page 244: ......
Page 406: ......
Page 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Page 1016: ......