(6) Pressure release (LOAD switch)
Switch the injection valve to the LOAD side to release
pressure in the loop.
Buffer tube
Syringe valve
Syringe
Wash pump
5
1
3
2
4
Plunger
wash
Needle
Injection valve
Sample
Rack
P
Needle
Injection port
5
4
3
2
1
6
Loop
Degassing unit
Wash
fluid1
Wash
fluid2
Waste
solution
Waste
solution
Wash port
From Pump To Column
Degassing
unit
3-way solenoid valve
2 - 32
Summary of Contents for CHROMASTER 5160
Page 244: ......
Page 406: ......
Page 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Page 1016: ......