3 - 43
3.3.4 Dynamic Mixer Logbook
The total running time after replacement of a maintenance part
for a dynamic mixer (option) is indicated. This function is
enabled only when the dynamic mixer is connected.
This function is used as an index of a replacement for
maintenance parts of the dynamic mixer.
GLP (LOGBOOK=1, PRESSURE M=2, KEY LOCK=3)
1
LOGBOOK (PUMP SEAL=1, P.WASH=2,
4 A.VALVE=3, D.MIX=4, P.VALVE=5)
Select LOGBOOK
1 ENT
LOGBOOK (REPORT=1, RESET=2)
1
Select A.VALVE
4 ENT
Monitor screen
GLP
Monitor screen
Select RESET
2 ENT
D. MIX STIRRERCHANGE (MM DD YYYY)
<2000 - 2100> 9 1 2010
Reset logbook
NOTE
: Enter the maintenance part for the dynamic mixer replacing
date.
Enter Month, Date, Year. And press ENT.
In other words, it can’t be reset without pressing the ENT
key. Even if the previous data is still indicated, reenter a
desired date and press ENT .
The total running time will be indicated as zero, and
integration will be started.
Monitor screen
D.MIX TIME LAST CHANGED DATE
99999h 09/01/2010
The total running time after replacement of a
maintenance part for the dynamic mixer is
indicated.
ENT or ESC
1=Displaying logbook
2=Resetting logbook
Select REPORT
1 ENT
Summary of Contents for CHROMASTER 5160
Page 244: ......
Page 406: ......
Page 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Page 1016: ......