2. Installation Conditions
Confirm that the following requirements are satisfied before
installing the instrument.
(1) Power
Supply
Power supply
voltage
: 100 to 115/220 to 240 V AC
Fluctuation should be within
±
10% of the
rated voltage.
Frequency
: 50 or 60 Hz
Fluctuation should be within
±
0.5 Hz of
the rated frequency.
Power capacity : 330 VA or more for a single instrument,
and 1080 VA or more for the total system.
The total system shown comprises
Chromaster organizer, Chromaster 5110
pump, Chromaster 5210 column oven,
and Chromaster 5440 fluorescence
detector.
Check and prepare a power supply
meeting the power supply requirements
for your actual system configuration and
OA equipment to be used in combination.
Power outlet
: A power outlet shall be available near
the installation position of the system
including this instrument.
This instrument requires a single
grounded power outlet (3-pole type).
At least one additional outlet is needed
for the entire system.
APPENDIX 1 - 2
Summary of Contents for CHROMASTER 5160
Page 244: ......
Page 406: ......
Page 999: ...Retaining screws Fixing bracket Appended Fig 1 5 Removal of Fixing Brackets APPENDIX 1 13 ...
Page 1016: ......