8B-109 Air Bag System:
ii) Clear space (3) on ground about 185 cm (6
ft) in diameter where side air bag (inflator)
module for deployment. Paved, outdoor
location where there is no activity is
preferred. If outdoor location is not available,
space on shop floor where there is no activity
and provide sufficient ventilation. Ensure no
loose or flammable objects are within
deployment area.
iii) Place deployment fixture (A) on ground in
Step i).
Special tool
(A): 09932–75041
iv) Fill plastic reservoir in deployment fixture (A)
with water or sand. This is necessary to
provide sufficient stabilization of fixture
during deployment.
v) Attach side air bag (inflator) module (1) in
deployment fixture using mounting
attachment, hold-down bolts & nuts and M8
bolt & nut (2).
NOTE
Make sure that deploying direction faces as
shown in figure against mounting
attachment.
CAUTION
!
Be sure to use M8 size and 7T strength bolt
and nut for fixing side air bag (inflator)
module to deployment fixture (A).
d) For seat belt pretensioner
i)
Cut webbing (1) at tongue plate stopper (3)
of seat belt pretensioner (2) side as shown.
NOTE
Hold seat belt pretensioner (2) vertically in
the same condition as it is installed.
Otherwise, webbing can’t be pulled out.
ii) Remove tongue plate (4) and shoulder
anchor (5) from webbing.
iii) Tie webbing (1) tightly at 10 cm (3.9 in.) from
cutting edge as shown.
iv) Tie seat belt pretensioner (2) with wire
harness (3) to wheel-installed tire (4) as
shown.
Wire harness specification
Stripped wire harness section 1.25 mm
2
(0.0019 in.
2
) or more (Stripped wire
harness diameter 1.25 mm (0.05 in.) or
more)
NOTE
Wind wire harness (3) around at least 3 times.
1
(A)
2
3
I3RH0A820081-01
2
1
5
4
3
I2RH01820066-01
Summary of Contents for Liana RH413
Page 2: ......
Page 4: ......
Page 6: ......
Page 336: ...1K 4 Exhaust System...
Page 456: ...3D 4 Propeller Shafts...
Page 553: ...Automatic Transmission Transaxle 5A 5 4WD I3RH0A510002 01 1 Transfer...
Page 1044: ...8B 119 Air Bag System...
Page 1049: ...Table of Contents 9 v Roof Molding Components 9M 1 Splash Guard If Equipped Components 9M 2...
Page 1278: ...9M 3 Exterior Trim...
Page 1300: ...Prepared by 1st Ed Nov 2003 2nd Ed Feb 2007...
Page 1301: ...19 mm 99500 54G10 01E 99500 54G10 01E SERVICE MANUAL VOLUME 1 OF 2 SERVICE MANUAL VOL 1 OF 2...
Page 1302: ...27 mm 99500 54G10 01E 99500 54G10 01E SERVICE MANUAL VOLUME 2 OF 2 SERVICE MANUAL VOL 2 OF 2...