6C-9 Power Assisted Steering System:
P/S Pump Drive Belt Removal and Installation
S3RH0A6306018
Removal
1) Disconnect negative cable at battery.
2) Remove engine undercover of right side, and then
loosen tension pulley bolt (1) and nut (2).
3) Remove power steering belt.
Installation
1) Install belt to power steering pump pulley (1),
crankshaft pulley (2), A/C pulley (if equipped) (3) and
tension pulley (4).
2) Adjust belt tension by referring to “P/S Pump Drive
P/S Pump Drive Belt Inspection
S3RH0A6306019
Check power steering belt for wear and cracks, and
replace as required.
Tie-Rod End Boot On-Vehicle Inspection
S3RH0A6306007
Check boot for crack and damage. If any, replace it with
a new one.
Tie-Rod End Removal and Installation
S3RH0A6306009
Removal
1) Hoist vehicle, and then remove wheel.
2) Remove split pin (1), and then tie-rod end castle nut
(2).
3) Using special tool, remove tie-rod end from knuckle.
Special tool
(A): 09913-65210
I2RH0B630005-01
I2RH0B630006-01
I2RH01630013-01
I2RH01630015-01
I2RH01630016-01
Summary of Contents for Liana RH413
Page 2: ......
Page 4: ......
Page 6: ......
Page 336: ...1K 4 Exhaust System...
Page 456: ...3D 4 Propeller Shafts...
Page 553: ...Automatic Transmission Transaxle 5A 5 4WD I3RH0A510002 01 1 Transfer...
Page 1044: ...8B 119 Air Bag System...
Page 1049: ...Table of Contents 9 v Roof Molding Components 9M 1 Splash Guard If Equipped Components 9M 2...
Page 1278: ...9M 3 Exterior Trim...
Page 1300: ...Prepared by 1st Ed Nov 2003 2nd Ed Feb 2007...
Page 1301: ...19 mm 99500 54G10 01E 99500 54G10 01E SERVICE MANUAL VOLUME 1 OF 2 SERVICE MANUAL VOL 1 OF 2...
Page 1302: ...27 mm 99500 54G10 01E 99500 54G10 01E SERVICE MANUAL VOLUME 2 OF 2 SERVICE MANUAL VOL 2 OF 2...