I-2
FRX8000 3. 0 User G uide, Rev 02
F
Configure Connections and Routing Paths
A
Configure Subscriber
B
Configure Abbreviated Address
C
Configure PVC Connection
– (
trunk
) (
frame relay
) (
X.25
) (
async
) (
IP
)
D
Configure IP Route
E
Configure IPX Route
F
Configure Group Name
G
Configure Group Send
H
Configure Telephone Number
(
trunk
) (
X.25
)
I
Configure T1/E1 Channel Map
G
Configuration Report
H
Change Passwords
B Operations
A On-Line Port Operations
A
Disable a Port
C
Enable a Port
J
Display/Change Async PAD Profile
K
Modem (V25bis) Operations
L
Display LP Status
B Node Operations
A
Change Alternate Node
B
Re-IPL Remote Node
C
Boot Disk Local Operations
D
Boot Disk Download Operations
A Configuration Update
B All Software Update
C LP Software Update
D Node Software Update (N74/7500 only)
E Single File Update
E
Rollover Accounting Information File
F
Display/Delete Call Accounting File
G
Download Filter Definitions
H
Convert 5.0 Node Database
C
Database Concurrency Operations
A Perform Database Recovery
B Clear Remote Master
C Enable Backouts
D Create/Delete PVC On Line
(
trunk
) (
frame relay
) (
X.25
) (
async
) (
IP
)
E
File Transfer
F
Remote Control
G
Update Network Defaults
H
Message Services
C Status Displays
A
Node Status
B
Port Status
C
Virtual Connections
D
Line Monitor
E
Trunk Status
G
IPX RIP Table Display
H
IPX SAP Table Display
Summary of Contents for Netlink FRX8000
Page 1: ...User Guide For Release 3 0 09 41 06 150 02 The Complete Networking Solution T M ...
Page 2: ......
Page 14: ......
Page 15: ...Section I Getting Started ...
Page 16: ......
Page 25: ...Section II Configuration ...
Page 26: ......
Page 40: ......
Page 60: ......
Page 80: ......
Page 106: ...7 26 FRX8000 3 0 User Guide Rev 02 ...
Page 148: ...9 30 FRX8000 3 0 User Guide Rev 02 ...
Page 251: ...Section III Operation ...
Page 252: ......
Page 392: ......
Page 397: ...Section IV Appendices ...
Page 398: ......
Page 410: ......
Page 444: ......
Page 448: ......