Automated Chemistry Analyzer
AU2700 User's Guide
????, 2006
Chapter C - Basic Operations
C-55
ISE Maintenance Required Every Three Months
Replace the Mixture and Mid-Standard pump roller tubing.
•
Replace the Pinch Valve tubing.
•
As Needed Analyzer Maintenance
Replace or Clean Individual Cuvettes.
•
Clean Cuvettes and the Cuvette Wheel (Part of 6 month PM).
•
Replace the Sample and Reagent Probes.
•
Replace Mix Bars.
•
Replace the Wash Nozzle Joint Tubes.
•
Replace Sample, Reagent, and ISE (Buffer) Syringes.
•
Replace the Deionized-Water Filter (Part of 6 month PM).
•
Replace the Sample Probe Filter (Part of 6 month PM).
•
Replace the Photometer Lamp (Part of 6 month PM).
•
Perform a W1 procedure.
•
Clean Air Filters (Part of 6 month PM).
•
Clean belts and rack transport areas.
•
Sonicate the sample probes.
•
Clean the mix bars.
•
Clean or replace the static discharge brushes.
•
As Needed ISE Maintenance
Replace the reference electrode.
•
Add reference electrode solution.
•
Replace reagents.
•
Replace the Na, K, and Cl electrodes.
•
Replace the ISE reagent (buffer) syringe.
•
ISE Cleaning (Manual) procedure.
•
See Also
For detailed information on performing Maintenance, refer to the Maintenance Chapter.
Содержание AU2700
Страница 17: ...A 4b Automated Chemistry Analyzer AU2700 User s Guide November 1 2009 This page intentionally left blank ...
Страница 178: ...D 4 Chapter D Software Automated Chemistry Analyzer AU2700 User s Guide March 31 2005 ...
Страница 260: ...D 86 Chapter D Software Automated Chemistry Analyzer AU2700 User s Guide May 2002 ...