Automated Chemistry Analyzer
AU2700 User's Guide
Chapter D - Software
D-185
May, 2002
Use this software screen to:
Display periodic maintenance for a data list:
Records of previous periodic maintenance procedures can be referred to by selecting a
maintenance item. In the [Periodic Maintenance] screen, move the cursor to a consumable and
press function key F6 (history). Test names, execution intervals, the last ten execution dates, and
future dates will be displayed in a list.
Display the maintenance schedule:
Select function key F4 (grid display) to graphically display the maintenance schedule.
Keep a record of periodic maintenance:
1. Move the cursor to the maintenance procedure that was performed.
2. Select function key F5 (execute).
The "executed" date and "next" scheduled date will appear.
Note
The Photocal and W2 are automatically updated for the "executed" and "next" scheduled dates.
Содержание AU2700
Страница 17: ...A 4b Automated Chemistry Analyzer AU2700 User s Guide November 1 2009 This page intentionally left blank ...
Страница 178: ...D 4 Chapter D Software Automated Chemistry Analyzer AU2700 User s Guide March 31 2005 ...
Страница 260: ...D 86 Chapter D Software Automated Chemistry Analyzer AU2700 User s Guide May 2002 ...