GUI Reference
R&S
®
ZNB/ZNBT
267
User Manual 1173.9163.02 ─ 38
In the upper part of the "Cal Unit" screen, the R&S
ZNB/ZNBT shows the calibration
sweep diagrams for the currently measured S-parameter, the lower part visualizes the
active port assignment and the measurement progress.
Calibration Sweep Diagrams
During the calibration sweep each diagram contains a single S-parameter trace and a
typical result trace for the measured calibration standard.
If switch matrices are involved, a sweep is performed for every possible signal path
and for each of these paths a separate S-parameter trace is shown (see
ter 4.7.20.5, "Multiple Paths and Calibration"
Cal Softtool