
GUI Reference
R&S
®
ZNB/ZNBT
367
User Manual 1173.9163.02 ─ 38
between physical VNA ports and DUT ports. Furthermore it provides convenient
access to port-related settings.
Access:
CHANNEL – CHANNEL CONFIG > "Port Config" > "Multiple DUTs..."
Related information
See
Chapter 4.1.4.2, "Parallel Measurements on Multiple DUTs"
For the R&S
ZNB the "Parallel Measurement" is automatically configured when
"Enabled" is selected, as shown in
.
A R&S
ZNB/ZNBT with two internal sources allows parallel measurements with "Fre-
quency Offset", which can be configured in the corresponding tab on the right.
Figure 5-27: Define Parallel Measurement (R&S
ZNB)
For the R&S
ZNBT the table and controls in the lower left part allow to define the avail-
ble DUTs along with their physical ports. The visualization in the upper left part shows
the ports and connectivity of the selected DUT (DUT perspective). The "DUT Defini-
tion" tab to the right visualizes the VNA perspective.
Channel Config Softtool