![Rohde & Schwarz ZNB20 User Manual Download Page 313](http://html.mh-extra.com/html/rohde-and-schwarz/znb20/znb20_user-manual_1477889313.webp)
GUI Reference
R&S
®
ZNB/ZNBT
298
User Manual 1173.9163.02 ─ 38
Remote command:
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment<Asg>:DEFine
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment<Asg>:DEFine:TPORt
[SENSe<Ch>:]CORRection:COLLect:AUTO:ASSignment:COUNt?
Default Port Assignment
Restores the default port assignment(s).
Remote command:
Start
.
If the configured port assignments are invalid, this action is disabled.
Step 3: SMARTerCal
In the final step the R&S
ZNB/ZNBT displays a "SMARTerCal" screen that guides the
user through the calibration data acquisition.
1. For each port assignment, connect the calibration unit to the related set of test
ports and perform an automatic system error correction.
2. Finally, replace the calibration unit by the power meter and start the power calibra-
tion sweep.
During the system error correction substep, the upper part of the "Cal Unit" screen dis-
plays the calibration sweep diagrams for the currently measured S-parameter and the
lower part visualizes the active port assignment and the measurement progress.
Cal Softtool