TROUBLESHOOTING [ENGINE CONTROL FS]
STEP
INSPECTION
ACTION
5
CHECK FTP SIGNAL CIRCUIT FOR
SHORTS TO FTP SENSOR GROUND AND
GROUND CIRCUIT
•
Key off.
• FTP sensor disconnected.
• Disconnect PCM. Inspect for damaged or
pushed out pins, corrosion and loose wires.
Service as necessary.
• Install breakout box. Leave PCM
disconnected.
• Disconnect NGS tester from DLC.
•
Measure the resistance between Test Pin
62 and Test Pin 91 at breakout box.
•
Measure resistance between Test Pin 62
and Test Pins 51 and 103 at breakout box.
• Is each resistance greater than
10,000
ohms?
Yes
FTP signal circuit is shorted to FTP sensor ground or
ground circuit in PCM.
REPLACE PCM.
REMOVE breakout box.
RECONNECT all components.
RERUN OBD Test.
No
SERVICE harness short between FTP signal circuit and
FTP sensor ground or ground circuit.
REMOVE breakout box.
RECONNECT all components.
RESET PCM to completely clear DTCs.
er
After Repair Procedure
COMPLETE OBD II Drive Mode.
RERUN OBD Test.
6
EVAPORATIVE SYSTEM RE-CHECK
•
RESET PCM to completely clear DTCs.
c r After Repair Procedure
• COMPLETE OBD II Drive Mode.
• Is MIL illuminated?
Yes
ISOLATE pressure leak in evaporative emission system
(vacuum/fuel vapor hose connections, cracked/split
hoses, damaged components. SERVICE as necessary.
VERIFY symptom no longer exists.
RESET PCM to completely clear DTCs.
rr
After Repair Procedure
COMPLETE OBD II Drive Mode.
RERUN OBD Test.
No
If detected here from previous step, return to that step and
continue step.
RETURN to the Action to Take column of the Pinpoint Test
Step that directed you here.
01-01A-71
Summary of Contents for MX-6 1998
Page 1: ......
Page 501: ...STARTING SYSTEM 3 If not as specified replace the starter interlock switch 01 19 3...
Page 803: ...MANUAL TRANSAXLE W 6 U 5 1 5 W A C 05 15 7...
Page 934: ...CONTROL SYSTEM CONTROL SYSTEM STRUCTURAL VIEW W6U740WA0 07 40 2...
Page 983: ...SERVICE TOOLS 08 60 SERVICE TOOLS 08 RESTRAINTS S S T 08 60 1 08 RESTRAINTS SST 08 60 1...