![Rohde & Schwarz ZVL series Operating Manual Download Page 42](http://html.mh-extra.com/html/rohde-and-schwarz/zvl-series/zvl-series_operating-manual_1477904042.webp)
R&S ZVL
Preparing for Use
Putting the Instrument into Operation
Quick Start Guide 1303.6538.62 - 06
27
DC power supply
The power supply (SELV) that is used must fulfill the requirements for reinforced/double
insulation for main supply circuits in accordance to DIN/EN/IEC 61010 (UL 61010B–1,
CSA C22.2 No. 1010.1) or DIN/EN/IEC 60950 (UL 1950, CSA C22.2 No. 950). It is
recommended to fuse the DC power supply appropriately. Before switching on the
instrument check the connection for correct polarity.
Battery pack
The power supply that is used must fulfill the requirements for reinforced/double
insulation for main supply circuits in accordance to DIN/EN/IEC 61010 (UL 61010B–1,
CSA C22.2 No. 1010.1) or DIN/EN/IEC 60950 (UL 1950, CSA C22.2 No. 950).
Note:
If the battery is not to be used for a longer time, it is recommended to remove it
and store it separately.
1.3.12 Charging the Battery
The battery can be charged via the AC or the DC power supply without being removed:
C
To charge the battery using the AC power supply, connect the instrument to the
mains supply and switch on the AC power on the rear panel. The power on/off key
on the front panel can be set either way.
C
To charge the battery using the DC power supply, connect the instrument to the DC
power supply.
If you have more than one battery packs in use, you can also charge them outside the
instrument using the power supply unit of option R&S FSL–Z4 (DC Supply for FSL–
B31, stock no. 4052.3041.00). An LED with the inscription "Charge" is switched on
during charging.
Charging conditions
Approximate duration
AC power supply, standby mode
5 h
AC power supply, instrument is switched on
9 h
DC power supply, instrument is switched off
5 h
DC power supply, instrument is switched on
9 h
External charging (battery removed)
5 h