
R&S ZVL
GUI Reference
Channel Menu
Operating Manual 1303.6580.32-06
219
•
Start Cal
opens a submenu to select a new calibration and start the calibration wizard.
•
Repeat Prev Cal
reopens the wizard to repeat and optimize the previous calibration.
•
Correction Off
activates or deactivates the system error correction in the active channel.
•
Port Extensions provides a selection of length offset parameters to shift the measurement plane.
•
Cal Manager
opens a dialog to store system error correction data to a Cal Pool and to assign
correction data to channels.
•
Recall Last Cal Set
loads and activates the setup for which the last calibration was performed.
•
Cal Kits
opens a dialog to
manage the calibration kits in use, add new kits and import or export
kits.
Start Cal
The
Start Cal
submenu
selects the calibrated ports and the calibration type.
The calibration types depend on the number of test ports of the analyzer. For a four-port unit:
•
One-Port P1
and
One-Port P2
open submenus to select a one-port calibration at test ports PORT
1 and PORT 2, respectively.
•
Two-Port P1 P2
opens a submenu to select a two-port calibration at test ports PORT 1 and
PORT 2.
Calibrations can be performed automatically using the Calibration Unit (accessory R&S ZV-Z5x).
Remote control:
[SENSe<Ch>:]CORRection:COLLect:METHod:DEFine
One-Port P1, One-Port P2
Opens a submenu to select a one-port calibration at test ports PORT 1 or PORT 2. The two submenus are
identical: