
Synergy Q/MD Engineering Manual (v9.1 MD)
Physical Installation • 3–19
Removing/Installing Circuit Boards
The Synergy Q/MD frame comes standard with all the circuit boards already installed. If daughter
cards or boards need to be installed, or replaced, you will have to go into the Synergy Q/MD frame
and either remove and install or install the boards you need.
When a new board is installed, the switcher checks the current version of software on the board and
tries to upgrade it the current version of the switcher. If the software on the board is the same as the
software on the switcher, there is no change. If the board has a software version that is different than
the version on the switcher, the switcher will upgrade the board to the same version as the switcher.
For this reason it is important that you upgrade your switcher to the latest version of Synergy Q/MD
software prior to installing a new board into the frame.
Refer to the section “
” on page 6-8 for more information on upgrading your
switcher.
If you are installing one of the following options, refer to Chapter 29, “
Hardware Options
” for
detailed instructions:
•
Squeeze & Tease MD
•
Squeeze & Tease MD WARP
•
XFX Extra Effects Card
Front Frame Circuit Boards
The circuit boards at the front of the Synergy Q/MD frame manipulate video coming from the Video
Input Board at the back of the frame. These boards can be removed and replaced as needed by
removing the front door of the frame and sliding the desired boards out.
Front Board Locations
The front of the frame is where most of the video processing boards are located. The location and
number of boards that are installed in the frame depends on the number of MLEs, and Squeeze &
Tease DVE channels you require per MLE-pair. Refer to the following table, and the illustrations of
the frame, for information on which slot each front frame board should be installed in.
Front Frame Boards
Slot
QMD
MD
Slot 0
Fan Board
Fan Board
Slot 1
Video Processor Board
Video Processor Board
Slot 2
Squeeze & Tease Carrier
Squeeze & Tease Carrier
Slot 3
Video Processor Board
Содержание Synergy MD
Страница 1: ...Ross Video Limited Synergy Q MD Engineering Manual Volume I Software Issue 9 1 MD ...
Страница 10: ......
Страница 18: ...viii Contents Synergy Q MD Engineering Manual v9 1 MD ...
Страница 46: ...1 28 Introduction Synergy Q MD Engineering Manual v9 1 MD ...
Страница 204: ...7 34 BNC Configuration and Check Synergy Q MD Engineering Manual v9 1 MD ...
Страница 302: ...10 56 Custom Controls Synergy Q MD Engineering Manual v9 1 MD ...
Страница 366: ...13 16 SmartConversion Synergy Q MD Engineering Manual v9 1 MD ...
Страница 370: ...GL 4 Glossary of Terms Synergy Q MD Engineering Manual v9 1 MD ...