ID
Parameter
CL
Setting range
[Default]
Description
) is configured to "Generator
load".
Example (Starting genset)
A plant made up of several
gensets with a rated power of 50,
100, and 200 kW is configured to
a maximum generator load of
70 % and a minimum generator
load of 40 %. One genset with
200 kW is running and the actual
load reaches 140 kW. This is the
70 % maximum load limit of the
running genset and requires the
start of the next genset.
• Low: a total generator rated
•
power of 294.7 kW is
requested and a 100 kW
genset will be started.
• Moderate: a total generator
•
rated power of 254.5 kW is
requested and a 100 kW
genset will be started.
• High: a total generator rated
•
power of 224.0 kW is
requested and a 50 kW
genset will be started.
Dependent Start Stop (LDSS)
Formulas”
formulas used for calculation.
Example (Stopping genset)
Two gensets with the same rated
power are configured to a
maximum generator load of 70 %
and a minimum generator load of
40 %.
The following example shows the
load level before stopping the
second genset and the resulting
load level for the first genset
depending on the dynamic
setting.
• Low:
•
Load level before stopping:
23.75%
Resulting load level for
remaining engine:
47.5% (25% of the difference
between 70 and 40%)
• Moderate:
•
Load level before stopping:
27.5%
Resulting load level for
remaining engine:
408
easYgen-3000XT Series
B37574
4 Configuration
4.4.5.5.4 Islanded Parallel Operation (IOP)
Released