516
13.2.5
Absolute position data transmission protocol
The description of communication procedure.
1.
When starting communication, the controller will enable ABSE signal and start DI/DO
communication of absolute system. After Ts digital input filter time, DI4, DO2 and DO3 will
switch to ABSQ, ABSR, ABSD.
2.
The controller sets the ABSQ signal to low level, which means that the host controller
makes a read request to the drive.
3.
After the Tq confirmation time, the drive has the data ready and enabled the ABSR signal
to notify the host controller for data reading.
Summary of Contents for SDP Series
Page 33: ...20 400V series DC 24V Power supply Note terminal P N cannot be grounded ...
Page 45: ...32 4 The last step is to fasten the screw of housing ...
Page 385: ...372 ...
Page 405: ...392 ...
Page 499: ...486 SME L040 SME L075 SME L100 SME L150 ...
Page 500: ...487 SME L200 SME L300 SME M100 SME M150 ...
Page 509: ...496 When the load reaches 300 the operation time is 5 51 seconds ...
Page 555: ...542 14 5 Manual version and revision history Manual version V1 00 Release month July 2022 ...