31
3.3.2 CN1 signal wire shielding and grounding
The both ends of the CN1 signal wire which are the CN1 connector and the upper controller
connector, their shielding and grounding wire must be connected to the corresponding pins to
effectively achieve the shielding and grounding functions.
The shielding of CN1 encoder connector wiring instruction is as follows:
1. Pull out the metal shielding, surround and fix it with a copper sheet.
2.Screw the big metal case to fix the cooper sheet, make sure the copper sheet is completely
covered the extended metal sheet, and it is contact with the metal part of the CN1 connector.
3. Put it into the connector housing as below picture shows:
Summary of Contents for SDP Series
Page 33: ...20 400V series DC 24V Power supply Note terminal P N cannot be grounded ...
Page 45: ...32 4 The last step is to fasten the screw of housing ...
Page 385: ...372 ...
Page 405: ...392 ...
Page 499: ...486 SME L040 SME L075 SME L100 SME L150 ...
Page 500: ...487 SME L200 SME L300 SME M100 SME M150 ...
Page 509: ...496 When the load reaches 300 the operation time is 5 51 seconds ...
Page 555: ...542 14 5 Manual version and revision history Manual version V1 00 Release month July 2022 ...