357
7. Either signal 5 or signal 6 can be output, and the
choice is specified in PD28. X.
8. Position deviation: when event 7 occurs, if signal
4 (or 5) is off, it means the position has deviated
and AL.1B can be triggered.
Note: set whether to enable this alarm with PD28.Y.
PD29
DID
Software DI A/B contact setting
The corresponding DI bit is 0:
If DI setting is LSP/LSN/EMG signal, it is B contact.
If DI setting is not LSP/LSN/EMG signal,it is A
contact.
The corresponding DI bit is 1:
If DI function is LSP/LSN/EMG, it is A contact.
If DI function is not LSP/LSN/EMG, it is B contact.
Note: if any DI is assigned to be controlled by
Communication(refer to PD16), this setting is invalid.
All 0000h
0000h
~
0FFFh
N/A
PD30 SDO
(■)
DO contact source control switch:
DO Source control switch.
Each bit of this
parameter determines one DO signal output source.
Bit0~Bit5 is correspond toDO1~DO6 separately.
The bit setting is as follows:
0: output contact status is controlled by program
automatically.
1: output contact status is controlled by PD31.
For DO functional assignment:
1.DO1 ~ DO5: PD10 ~ PD14
2.DO6: PD26
Turret
mode
0000h
0000h
~
003Fh
N/A
Summary of Contents for SDP Series
Page 33: ...20 400V series DC 24V Power supply Note terminal P N cannot be grounded ...
Page 45: ...32 4 The last step is to fasten the screw of housing ...
Page 385: ...372 ...
Page 405: ...392 ...
Page 499: ...486 SME L040 SME L075 SME L100 SME L150 ...
Page 500: ...487 SME L200 SME L300 SME M100 SME M150 ...
Page 509: ...496 When the load reaches 300 the operation time is 5 51 seconds ...
Page 555: ...542 14 5 Manual version and revision history Manual version V1 00 Release month July 2022 ...