![Rohde & Schwarz CMW-KE100 User Manual Download Page 275](http://html.mh-extra.com/html/rohde-and-schwarz/cmw-ke100/cmw-ke100_user-manual_1477807275.webp)
1xEV-DO Measurements
R&S
®
CMW-KM8xx/-KS8xx
275
User Manual 1173.9511.02 ─ 12
●
E4E2: (8-PSK, W
2
4
) + (8-PSK, W
1
2
)
Remote command:
CONFigure:EVDO:MEAS<i>:MEValuation:CARRier:SELect
CONFigure:EVDO:MEAS<i>:MEValuation:DMODulation
3.3.8 Multi Evaluation: Measurement Control
The "Measurement Control" parameters configure the scope of the 1xEV-DO multi
evaluation measurement.
See also: "Statistical Settings" in the R&S
CMW user manual, chapter "System Over-
view"
Fig. 3-25: Multi evaluation configuration: measurement control
................................................................................................ 275
Statistic Count Modulation / Spectrum
........................................................................ 276
................................................................................................ 276
..................................................................................... 277
................................................................................ 277
.............................................................................................277
Measurement Timeout
Defines a timeout for the multi evaluation measurement (in remote operation).
Remote command:
CONFigure:EVDO:MEAS<i>:MEValuation:TOUT
GUI Reference
深圳德标仪器
135-1095-0799