For more information, see Storage Space Creation.
7.
Click
Select
.
8.
Select the destination.
9.
Click
OK
.
10.
Optional: Specify the job identification information.
Field
Description
Job Name
Specify a job name that doesn't contain the following
characters. / | \ : ? < > * "
Description
Specify a job description
11.
Click
Next
.
12.
Optional: Configure the schedule settings.
Option
Description
Scheduler
Runs the job on a repeating schedule
Important
Only 30 schedules can be created per
job.
a.
Click
Add Schedule
.
The
Schedule
window opens.
b.
Configure the schedule.
c.
Click
OK
.
Run once after
Runs the job after a linked job is completed
Tip
A job must be selected from
Select a
linked job
menu.
No schedule
Runs only when a user starts the job
Backup now
Runs the job after the configuration is completed
13.
Optional: Configure the version management settings.
a.
Click
Version Management
.
b.
Click
Enable Version Management
.
QTS 4.5.x User Guide
Hybrid Backup Sync
339