Chapter 1: Installation and Initial Configuration
6
Operating Elevation
0-3000m
Conformance:
Safety
UL/EN 61010-1
EMC/EMI
EN61326-1, FCC Part 15 Class A
BCM2 Rear Panel Connectors and Controls
A
Voltage measurement input. Model
dependent: line cord or conduit knockout
B
Meter power input. Not present on line
cord models.
C
Meter Bus connectors. Daisy chains
multiple meters to common controller.
D
Meter Bus Terminator Switch.
Electrically terminates meter bus.
E
Meter ID switches. Assigns each meter a
unique ID number.
F
Eight branch circuit CT connectors (CT1
through CT8).
G
Panel mains CT connector.
H
Ground connection point (optionally
grounds meter to rack).
I
10/100 base-t Ethernet jack. (Models with
built-in meter controller.)
J
MODBUS RTU isolated RS485. (Models
with built-in meter controller.)
K
Sensor port. (Models with built-in meter
controller.)
Содержание PMC-1000
Страница 3: ...BCM2 Series Power Meter Xerus Firmware v3 4 0 User Guide...
Страница 23: ...Chapter 1 Installation and Initial Configuration 11 Panel Wiring Example...
Страница 54: ...Chapter 1 Installation and Initial Configuration 42 Branch Circuit Details...
Страница 76: ...Chapter 2 Connecting External Equipment Optional 64...
Страница 123: ...Chapter 3 Using the Web Interface 111...
Страница 558: ...Appendix D RADIUS Configuration Illustration 546 Note If your BCM2 uses PAP then select PAP...
Страница 559: ...Appendix D RADIUS Configuration Illustration 547 10 Select Standard to the left of the dialog and then click Add...
Страница 560: ...Appendix D RADIUS Configuration Illustration 548 11 Select Filter Id from the list of attributes and click Add...
Страница 563: ...Appendix D RADIUS Configuration Illustration 551 14 The new attribute is added Click OK...
Страница 564: ...Appendix D RADIUS Configuration Illustration 552 15 Click Next to continue...
Страница 594: ...Appendix E Additional BCM2 Information 582...
Страница 612: ......