- 49 -
If you perform empty-load commissioning, set P90.00 to 3 (Horizontal moving function macro),
set P11.08 to 0x000 to disable underload protection, and set P90.12 and P90.13 to 0 to prevent
the torque verification fault reporting caused by empty load.
During onsite commissioning, if the VFD terminal signal upward/downward running command is
inconsistent with the hook lifting/lowering, swap any two phase wires of VFD output terminals U,
V, and W.
This macro can meet the requirements of most horizontal moving application cases, and the
performance parameters have been optimized and do not need to be adjusted in most cases. If
an exception occurs, see the function parameter chapter for adjustment or contact the technical
support.
5.4 Commissioning tower crane rotating
5.4.1 Wiring
Braking resistor
GD350-19 VFD
S1
S2
S3
Forward
running
Reverse running
Multi-step speed setting terminal 1
S4
HDIA
HDIB
S5
S6
RO1A
RO1C
RO1B
HDO
CME
VFD fault
(+)
PB
RO2A
RO2C
RO2B
COM
+24V
COM
Multi-step speed setting terminal 2
Multi-step speed setting terminal 3
M
3~
M
3~
Y1
CME
Fault reset
Coasting to stop
Zero-speed
running
S7
S8
T
S
R
T
S
R
W
V
U
PW
+24V
Figure 5.4 Wiring for tower crane rotating
Note:
If the wiring is performed according to Figure 5.4, most VFD parameters need no adjustment. If
the onsite function terminals are inconsistent with the terminals shown in the figure, adjust the input
and output terminal functions according to the actual wiring after selecting the tower crane rotating
application macro.
5.4.2 Commissioning procedure
1. Check the wiring and ensure the wiring is proper.
2. Set P00.18=1.