
1 - 50
1.6 Checking for Normal Monitoring
■2.
Checking the wiring state (For optical loop system only)
Check if the optical fiber cable is connected correctly in [Loop test] of GX Developer.
For the GX Developer operation method, refer to the following manual.
➠
Q Corresponding MELSECNET/H Network System Reference Manual (PLC to PLC network)
(1) Check the [Receive direction error station] (The display example on GX Developer Version 8)
Startup procedure: GX Developer
[Diagnostics]
[MELSECNET (II)/10/H diagnostics]
■3.
Checking if the GOT is performed the data link correctly
(1) For MELSECNET/H, MELSECNET/10 network system
Check if the GOT is performed the data link correctly in [Other station information].
For the GX Developer operation method, refer to the following manual.
➠
Q Corresponding MELSECNET/H Network System Reference Manual (PLC to PLC network)
(a)
Check [Communication status of each station] and [Data-Link status of each station] (The display
example on GX Developer Version 8)
Startup procedure: GX Developer
[Diagnostics]
[MELSECNET (II)/10/H diagnostics]
Loop test
Other station info.
Summary of Contents for GOT2000 Series
Page 2: ......
Page 84: ......
Page 432: ...6 58 6 6 Precautions ...
Page 578: ...9 54 9 6 Precautions ...
Page 726: ...12 84 12 5 Precautions ...
Page 756: ......
Page 822: ...14 66 14 4 Device Range that Can Be Set ...
Page 918: ...15 96 15 7 Precautions ...
Page 930: ...16 12 16 6 Precautions ...
Page 964: ......
Page 1002: ...19 38 19 7 Precautions ...
Page 1022: ...20 20 20 5 Precautions ...
Page 1023: ...MULTI CHANNEL FUNCTION 21 MULTI CHANNEL FUNCTION 21 1 ...
Page 1024: ......
Page 1054: ...21 30 21 5 Multi channel Function Check Sheet ...
Page 1055: ...FA TRANSPARENT FUNCTION 22 FA TRANSPARENT FUNCTION 22 1 ...
Page 1056: ......
Page 1223: ......