1.3 Option Devices for the Respective Connection
1 - 27
1
PREP
ARA
T
O
R
Y PROC
EDURE
S FOR MONIT
O
RING
■6.
When using the video input unit, RGB input unit, video/RGB input unit, RGB output unit, or
multimedia unit
Only either one of the video input unit, RGB input unit, video/RGB input unit, RGB output unit, or multimedia unit can be
installed to the GOT.
Install the video input unit, RGB input unit, video/RGB input unit, RGB output unit, or multimedia unit at the 1st stage of
the extension interface. These communication units cannot be used if installed in the 2nd or higher stage.
When any of these units is used, the communication units indicated below must be installed in the 2nd stage of the
extension interface.
Example: When installing a video input unit and a MELSECNET/H communication unit
Communication unit
Model
Bus connection unit
GT15-QBUS2, GT15-ABUS2
MELSECNET/H communication
unit
GT15-J71LP23-25, GT15-J71BR13
CC-Link IE Controller Network
connection
GT15-J71GP23-SX
CC-Link communication unit
GT15-J61BT13
MELSECNET/H
communication unit
MELSECNET/H
communication unit
Video/RGB
input unit
Video/RGB
input unit
Summary of Contents for GOT2000 Series
Page 2: ......
Page 84: ......
Page 432: ...6 58 6 6 Precautions ...
Page 578: ...9 54 9 6 Precautions ...
Page 726: ...12 84 12 5 Precautions ...
Page 756: ......
Page 822: ...14 66 14 4 Device Range that Can Be Set ...
Page 918: ...15 96 15 7 Precautions ...
Page 930: ...16 12 16 6 Precautions ...
Page 964: ......
Page 1002: ...19 38 19 7 Precautions ...
Page 1022: ...20 20 20 5 Precautions ...
Page 1023: ...MULTI CHANNEL FUNCTION 21 MULTI CHANNEL FUNCTION 21 1 ...
Page 1024: ......
Page 1054: ...21 30 21 5 Multi channel Function Check Sheet ...
Page 1055: ...FA TRANSPARENT FUNCTION 22 FA TRANSPARENT FUNCTION 22 1 ...
Page 1056: ......
Page 1223: ......