1 - 2
1. PREPARATORY PROCEDURES FOR MONITORING
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Step 1.
Setting the communication interface
Determine the connection type and channel No. to be used, and perform the communication setting.
➠
1.1Setting the Communication Interface
➠
Each chapter GOT Side Settings
Step 2.
Writing the package data
Write the project data, system application onto the GOT.
➠
1.2.1Writing the Package Data onto the GOT
Step 3.
Verifying the package data
Verify the project data, system application are properly written onto the GOT.
➠
1.2.2Checking the package data writing on GOT
Step 4.
Attaching the communication unit and connecting the cable
Mount the optional equipment and prepare/connect the connection cable according to the connection type.
➠
1.3Option Devices for the Respective Connection
➠
1.4Connection Cables for the Respective Connection
➠
Each chapter System Configuration
➠
Each chapter Connection Diagram
Step 5.
Verifying GOT recognizes connected equipment
Verify the GOT recognizes controllers on [Communication Settings] of the Utility.
➠
1.5Verifying GOT Recognizes Connected Equipment
Step 6.
Verifying the GOT is monitoring normally
Verify the GOT is monitoring normally using Utility, Developer, etc.
➠
Summary of Contents for GOT2000 Series
Page 2: ......
Page 84: ......
Page 432: ...6 58 6 6 Precautions ...
Page 578: ...9 54 9 6 Precautions ...
Page 726: ...12 84 12 5 Precautions ...
Page 756: ......
Page 822: ...14 66 14 4 Device Range that Can Be Set ...
Page 918: ...15 96 15 7 Precautions ...
Page 930: ...16 12 16 6 Precautions ...
Page 964: ......
Page 1002: ...19 38 19 7 Precautions ...
Page 1022: ...20 20 20 5 Precautions ...
Page 1023: ...MULTI CHANNEL FUNCTION 21 MULTI CHANNEL FUNCTION 21 1 ...
Page 1024: ......
Page 1054: ...21 30 21 5 Multi channel Function Check Sheet ...
Page 1055: ...FA TRANSPARENT FUNCTION 22 FA TRANSPARENT FUNCTION 22 1 ...
Page 1056: ......
Page 1223: ......