![Honda Marine BF40D Manual Download Page 278](http://html.mh-extra.com/html/honda/marine-bf40d/marine-bf40d_manual_2157783278.webp)
11-29
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
6. VERTICAL SHAFT/BEVEL GEAR
a. DISASSEMBLY
Remove the following parts.
- Propeller (P. 11-2)
- Gear case assembly (P. 11-3)
- Propeller shaft holder assembly (P. 11-7)
- Water pump/shift rod (P. 11-19)
1) Attach the special tool to the end (primary driven gear
installation side) of the vertical shaft.
TOOL:
Vertical shaft holder
07LPB-ZV30200
2) Place a shop towel or equivalent material as shown to
protect the gear case.
3) Holding the vertical shaft with the special tool, remove the
12 mm special flange nut and remove the pinion gear from
the vertical shaft.
4) Remove the vertical shaft assembly from the gear case
assembly.
5) Remove the water bottom tube and the rubber set plate
from the gear case assembly.
[2]
VERTICAL SHAFT HOLDER
07LPB-ZV30200
[1]
VERTICAL SHAFT
[6]
GEAR CASE
[4]
GEAR CASE
ASSEMBLY
[1]
VERTICAL SHAFT
ASSEMBLY
[3]
RUBBER SET
PLATE
[2]
WATER BOTTOM
TUBE
[4]
12 mm SPECIAL
FLANGE NUT
[3]
PINION
GEAR
[5]
SHOP
TOWEL
278