Installing the Hardware
Step 1: Assembling All Materials
Octel 50 Installation Guide
3-2
Step 1: Assembling All Materials
The following list of materials should be assembled before beginning the hardware
installation.
Materials Checklist
Assembled PC, including:
CPU (Memory and hard disk should already be installed.)
CPU power cord
Monitor-to-CPU cord
Monitor
Monitor power cord
Keyboard
Printer and cable (Optional)
Voice and fax boards
Sentinel
UPS
UPS cable
Butt set
Digit grabber
Ground strap
Modular RJ-14 cables (4-connector)
Power strip
2500 set (at least one)
Phone system documentation
Octel 50 Configuration Note for the customer’s switch
Line simulator
DOS installation disks and manual
Octel 50 software
Octel 50 manuals
Hard disk utility software and manual
One or two boxes of high-density disks for system backup
Mouse, software, and manual (Optional)
Modem, software, and manual (Optional)
Tape backup, software, and manual (Optional)
Tool kit (Phillips and flathead screwdrivers, wire strippers, crimping tool,
punch down tool, etc.)
Optional items, such as a modem or tape backup unit are not provided with the Octel 50
system nor are they supported by technical support.
Содержание Octel 50
Страница 2: ......
Страница 3: ...Octel 50 Installation Guide 585 313 134 Comcode 108503004 101 1840 000 Issue 1 June 1999 ...
Страница 8: ......
Страница 22: ...Determining System Needs Step 3 Consider Additional Hardware Needs OCTEL 50 INSTALLATION GUIDE 2 6 Notes ...
Страница 36: ...Installing the Hardware Step 10 Installing the Sentinel Octel 50 Installation Guide 3 14 Notes ...
Страница 52: ...Running the SMDI Utility Running SMDI as a Standalone Utility Octel 50 Installation Guide 5 4 Notes ...
Страница 180: ...Integrating with an Uninterruptible Power Supply Running UPS Integration Octel 50 Installation Guide 10 4 Notes ...