Index
C
SI Installation and Upgrades
863
June 2004
cabinet ground
,
370
cabinet grounds
,
334
,
382
cabinet grounds, connecting
,
346
cabinet location
auxiliary cabinet
,
330
EPN cabinet
,
329
EPN cabinets
,
365
,
366
PPN cabinet
,
329
,
365
,
366
cabinet, cabling to MDF
,
435
cabinets
attaching to floor
,
332
connecting DC pewer
,
350
cabinets, stabilizing for earthquake protection
,
391
,
393
cable
diagrams
,
771
fiber optic
,
193
,
198
,
205
,
209
,
210
,
396
single mode
,
767
fiber optic, cleaning
,
768
fiber optic, labels
,
768
fiber optic, multimode
,
767
Cable Clamps
System 75 XE
,
272
,
313
cable clamps
,
441
cable clamps, for cable slack manager
,
416
cable installation,control carrier outputs
,
413
cable routing guidelines
,
412
cable routing, MDF
,
412
cable slack manager, installing
,
441
cable slack manager, space requirements
,
416
cable tests
,
483
cable, attendant console cabling distances
,
516
cable, inter-cabinet
,
385
cable, TDM bus
,
385
,
386
,
388
,
389
Cables
Labeling R1V3 Single-Carrier
,
238
cables
25-pair I/O
,
416
,
441
DCS
,
594
fiber optic
,
356
installing
,
577
inter-cabinet
,
396
IP interface
,
629
IP Media Processor
,
611
,
615
labeling
,
113
,
149
,
295
outputs for control carrier
,
108
,
233
,
291
,
510
cables, installing
,
411
,
605
,
618
cables, installing between auxiliary cabinet and
MDF
,
436
cables, installing between cabinet and MDF
,
435
cabling
installing trunk cables
,
413
provisioning plan
,
404
cabling labels
,
412
cabling layout
,
427
call detail recording. See CDR.
calling queue
,
545
,
843
CallVisor ASAI, adding
,
584
CallVisor ASAI, installing
,
585
,
587
,
588
CAMA/E911 trunks
,
657
,
659
,
660
,
661
,
662
,
663
,
665
carbon block protectors
off-premises connections
,
528
CDR
option settings
,
752
printer
,
749
Cellular Business System
,
566
channel service unit. See CSU.
check commercial power
,
354
checking circuit pack configuration
,
489
,
497
checking system status
,
487
China, country code
,
471
circuit pack configuration, testing
,
489
,
497
circuit pack damage or discrepancies
,
329
,
364
circuit pack LEDs
,
484
circuit pack pinouts
,
771
,
774
Circuit Packs
G3i V2 Control Carrier
,
308
circuit packs
adding
,
567
classification
,
567
configuration testing
,
497
digital line
,
455
DS1 converter LEDs
,
485
duplication interface LEDs
,
485
installing
,
569
LEDs
,
485
pin designations
,
771
TN2183 analog line
,
842
TNCCSC-1 PRI-to-DASS converter
,
828
,
830
TNCCSC-2 PRI-to-DPNSS converter
,
828
,
830
TNPRI/BRI converter
,
829
,
830
Circuit Packs form
administration commands
,
449
circuit pack cabinet layouts
,
450
implementation notes
,
451
instructions
,
450
circuit packs, administering
,
449
C-LAN
,
593
,
607
,
610
,
623
test external connection to LAN
,
595
,
610
C-LAN connection, testing
,
737
C-LAN, installing
,
606
C-LAN-distributed firmware download
procedure
,
716
cleaning
fiber optic cables
,
768
closets
site locations
,
417
CO trunk
,
760
CO trunk pinouts
,
771
CO trunk wiring
,
504
CO trunk3-wire pinouts
,
774
CO trunks
,
669
coaxial converter, 888B
,
829
code calling access
,
584
collocated DS1 tie trunks, wiring
,
508
commands, introduction
,
448
COMSPHERE modem
,
746
concentrator cables, connecting trunk pairs
,
432
concrete encased ground
,
761
Concrete Floor
Front Mounting Angle
,
148
,
243
,
306
concrete floor mounting
,
331
,
367
conductor, coupled bonding
,
415
connect AC power
,
384
connect power and grounding
,
158
connectable administration terminals
,
427
connectable terminals
,
500
connectable voice and data terminals
,
425
connecting AC power
,
343
,
349