System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
SI Installation and Upgrades
263
June 2004
2
Behind control cabinet A of the single-carrier EPN:
— Install the same kind (either 9823-A or 9823-B) of lightwave transceiver on cable
connector at slot 2A01.
— Connect the fiber-optic cable, coming from control cabinet A of the PPN, to the 9823-type
lightwave transceiver at slot 2A01.
— Delicately attach the fiber-optic cable (with cable ties) to the rear covers of the EPN stack.
— Coil up the surplus length of fiber-optic cable, and place the coil either in the cable
manager or on the bottom shelf (holding the power supply) of the PPN cabinet.
3
Behind control cabinet B of the single-carrier PPN:
— Install a 9823-type lightwave transceiver on the connector at slot 1B01.
— Connect one end of a fiber-optic cable to the 9823-type lightwave transceiver at slot 1B01.
— Route the fiber-optic cable from the 9823-type lightwave transceiver to the cabinet’s cable
tray and downward out of the cabinet to the EPN stack.
— Delicately attach the fiber-optic cable (with cable ties) to the wall of the cable tray at the
built-in cable-tie positions.
4
Behind port cabinet B of the single-carrier EPN:
— Install the same kind (either 9823-A or 9823-B) of lightwave transceiver on cable
connector at slot 2B02.
— Connect the fiber-optic cable, coming from control cabinet B of the PPN, to the 9823-type
lightwave transceiver at slot 2B02.
— Delicately attach the fiber-optic cable (with cable ties) to the rear covers of the EPN stack.
— Coil up the surplus length of fiber-optic cable, and place the coil either in the cable
manager or on the bottom shelf (holding the power supply) of the PPN cabinet.