System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
SI Installation and Upgrades
231
June 2004
•
Repair kit for backplane pins (KS-22876 L2 or equivalent)
•
Documentation (book or PDF file) for the current release:
— Maintenance for Avaya DEFINITY® Server SI (555-233-123)
— DEFINITY® ECS R8.1 Administrator’s Guide (555-233-503)
Return to Task List
Unpack and inspect control cabinet for damage [75 XE upgrade]
Return to Task List
!
DANGER
:
Take care to avoid injury while cutting and removing bands.
1
Unpack the cabinet and remove the front door.
2
Visually inspect the cabinet for any physical damage caused during shipping.
3
Report any damage for appropriate action according to local procedures.
4
Remove all packing material from the cabinet.
Return to Task List
Verify software load [75 XE upgrade]
Return to Task List
1
Type
list configuration software-versions memory-resident
and press Enter.
2
Record the software load.
Return to Task List
Verify system status [75 XE upgrade]
Return to Task List
1
Verify that system status is normal.
Execute
status system 1
(If status is not normal, take the needed corrective actions.)
2
Verify that the system is alarm-free.
Execute
display alarms
(If the system is not alarm-free, take the needed corrective actions.)