System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
238
SI Installation and Upgrades
June 2004
Return to Task List
Label cables [75 XE upgrade]
Return to Task List
To make reconnecting the cables simpler and more reliable, label every connector cable associated with
the system (if it is not already labeled).
Return to Task List
Shut down DEFINITY AUDIX system [75 XE upgrade]
Return to Task List
A yellow caution sticker on the system’s power unit notifies you to shut down the AUDIX before
powering down the system.
!
WARNING:
Neglecting to shut down an AUDIX assembly before powering down the system cabinet
where it resides can damage the AUDIX disk.
1
Log into the AUDIX as craft.
NOTE:
If you have a dadmin login and password, you can use them instead of craft and the craft
password.
2
Type
reset system shutdown
and press Enter.
3
Press Enter again to start the shutdown.
The
SHUTDOWN Completed
message displays when the AUDIX is successfully shutdown. This
takes about 2 minutes.
CAUTION:
If leaving AUDIX System in the carrier, back it out about 2 in. (5 cm) to eliminate the
possibility of damage due to power surges.
Return to Task List