System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
290
SI Installation and Upgrades
June 2004
Verify software load [75 small upgrade]
Return to Task List
1
Type
list configuration software-versions memory-resident
and press Enter.
2
Record the software load.
Return to Task List
Verify system status [75 small upgrade]
Return to Task List
1
Verify that system status is normal.
Execute
status system 1
(If status is not normal, take the needed corrective actions.)
2
Verify that the system is alarm-free.
Execute
display alarms
(If the system is not alarm-free, take the needed corrective actions.)
3
Identify and record customer-placed busy-outs.
Execute
display errors
(Examine the error log and record the error 18s that identify the busy-outs
placed by the customer.)
NOTE:
You will restore the customer-placed busy-outs after you have upgraded the system.
4
For a system that has existing BX.25 links that are being retained after the upgrade: identify and
record them.
Execute
display communication-interface links
5
Execute the following commands and verify that the information is correct:
list station
list trunk-group
list hunt-group
list data-module
For upgrades from systems later than G1,
list ars analysis
For a system with Expert Agent later than G3V3,
list agent
If any command does not complete successfully, escalate the problem immediately.
1
Return to Task List
Save translations [75 small upgrade]
Return to Task List