R5/R6/R7/R8si to Avaya Communication Manager
Task List: R5/R6/R7/R8si to Avaya Communication Manager
102
SI Installation and Upgrades
June 2004
23
Set Daylight Savings Rule [from R5/R6/R7/R8si]
Make sure the active tone clock is in the active SPE before continuing.
24
Deliver or install the License File [from R5/R6/R7/R8si]
25
Administer No-License/Emergency Numbers [from R5/R6/R7/R8si]
26
Affix label [from R5/R6/R7/R8si]
27
Verify the upgrade [from R5/R6/R7/R8si]
28
Verify software version [from R5/R6/R7/R8si]
29
Restore busyouts [from R5/R6/R7/R8si]
30
If you changed scheduled maintenance parameters, restore the original values.
Re-enable
scheduled maintenance and alarm notification [from R5/R6/R7/R8si]
31
Check customer options [from R5/R6/R7/R8si]
32
Register the Switch for Maintenance [from R5/R6/R7/R8si]
33
Check link status [from R5/R6/R7/R8si]
34
Power up DEFINITY LAN Gateway system [from R5/R6/R7/R8si]
35
Power up DEFINITY AUDIX system [from R5/R6/R7/R8si]
36
Resolve alarms [from R5/R6/R7/R8si]
Restore any customer-placed busy-outs before you run the acceptance tests!
If the system contains adjuncts such as DEFINITY AUDIX, reseat them as required before you
run the acceptance tests.
37
Run acceptance tests [from R5/R6/R7/R8si]
38
Restore announcements (TN750 or TN750B only) [from R5/R6/R7/R8si]
or
Rerecord
announcements [from R5/R6/R7/R8si]
as necessary
39
Check SPE [from R5/R6/R7/R8si]
40
Save announcements and translation [from R5/R6/R7/R8si]
41
Return equipment [from R5/R6/R7/R8si]
Verify the required hardware [from
R5/R6/R7/R8si]
Return to Task List
The equipment in the table below must be:
•
Acquired from local Material Stocking Location (MSL
•
Delivered to the installation site before the upgrade begins
The TSC cannot source equipment for you.
To place a claim for missing equipment as part of the Streamlined Implementation process, call 1-800-
772-5409 and respond to the call prompter, or call the number provided by your Avaya representative.