G3V4vs/R5vs/R6vs to Avaya Communication Manager
Task List: DEFINITY vs to Avaya Communication Manager
SI Installation and Upgrades
165
June 2004
Run acceptance tests [from
G3V4vs/R5vs/R6vs]
Return to Task List
Run any acceptance tests that are appropriate for this upgrade. The acceptance tests are listed in these 3
checklists:
Test single-carrier cabinet systems
Test multi-carrier cabinet systems
Test telephones and other equipment
For details of the tests, see
Test the System
Test Telephones and Other Equipment
Test single-carrier cabinet systems
1
Check System Status for Each Cabinet
2
Check Circuit Pack Configuration
3
Test Time Division Multiplexing Bus in Processor Port Network
4
Test Tone-Clock Boards
5
Test Expansion Interface Circuit Packs
6
Test Time Division Multiplexing Bus for Each Expansion Port Network
7
Test Tone-Clock for Each Expansion Port Network
8
Test Tone-Clock Interchange for Each Expansion Port Network
9
Test Expansion Interface Exchange for Each Expansion Port Network
10
Check Circuit Pack Configuration
11
Save Translations, if Required
Test multi-carrier cabinet systems
1
Check System Status for Each Cabinet
2
Check Circuit Pack Configuration
3
Test TDM Bus in PPN
4
Test Tone-Clock Circuit Packs
5
Test SPE Duplication Memory Shadowing Link
6
Test Duplicated Switch Processing
7
Element Interchange
8
Test Expansion Interface Circuit Packs
9
Test TDM for each EPN
10
Test Tone-Clock for each EPN