Installation for MCC1 (Multicarrier Cabinets) Made Easy
SI Installation and Upgrades
325
June 2004
Installation for MCC1
(Multicarrier Cabinets) Made Easy
Perform these tasks to install multicarrier cabinets:
1
Install and Connect MCC1 (Multicarrier) Cabinet
2
Install Telecommunications Cabling
3
Bring the System Online
4
Test the System
5
Install and Wire Telephones
6
Install and Administer Trunks
7
Install and Wire Telephone Power Supply
8
Install Additional Hardware
9
Add IP Solutions
10
Install and Connect Modems
11
Administer the features, telephones, and other equipment according to customer data found on the
provisioning plan. Use the procedures in the Administrator’s Guide for Avaya Communication
Manager (555-233-506).
12
Test Telephones and Other Equipment
Select the activity you are currently performing to see information, task lists, and procedures for that
activity.
NOTE:
It may be more efficient to install each hardware component, administer it, and test it
before going on to install another component. As an example, install the attendant console
using the procedures in
Install and Wire Telephones
, administer it using the procedures in
the Administrator’s Guide for Avaya Communication Manager (555-233-506), and test it
using the procedures in
Test Telephones and Other Equipment
.
You can also find information on these topics here:
•
Option Switch Settings
•
Approved Grounds
•
Administering Fiber Optic Cables
•
Connector and Cable Diagrams (Pinout Charts)