Install and Connect MCC1 (Multicarrier) Cabinet
Task List: Connect DC Power and Ground
350
SI Installation and Upgrades
June 2004
2
Set the carrier circuit breakers to OFF.
Figure 99: Power Distribution Unit (J58890CH)
Return to Task List
Connect DC Power to PPN and EPN Cabinets
Return to Task List
1
Be sure the main circuit breaker is
OFF
.
2
Measure and cut 2 pieces of 1 AWG (#70) (44 mm
2
) wire long enough to reach from the DC
Power Cabinet to the PPN cabinet.
3
At the DC Power Cabinet, connect the -48 volt DC wire to the DC OUTPUT circuit breaker. See
Figure 95, Typical Power and Ground for a DC-Powered Cabinet,
on page 344. Connect the -48
volt RTN (return) wire to the ground discharge bar.
4
Route the wires out of the cabinet, through the hole in the lower rear cover, and to the PPN
cabinet.
5
Connect the -48 volt DC wire to the -48VDC terminal on the J58890CF Power Distribution Unit.
Figure notes
1
Connect small battery holdover
cable (or temperature sensor cable
from large battery cabinet) to J20
2
Carrier Circuit Breakers
3
Ground Terminal Block
4
Connect -48 VDC Return - 1
AWG (50 mm
2
) red cable here.
5
Connect -48 VDC - 1 AWG (50 mm
2
) black
cable
6
1 AWG (50 mm
2
) 50 ft (15.2 m) cable to large
battery cabinet. For cables greater than 50 ft
(15.2 m), contact your Avaya representative.
7
Ground Terminal Block
8
To AC load center or approved single-point
ground block
Exter
nal Alar
ms
-4
8V
D
C
R
etu
rn
Ca
rrie
r
B
A
C
D
E
F
/G
R
em
ote
Po
w
er
-4
8V
DC
B
atte
rie
s
pcdf010 KLC 020599
1
2
3
4
5
6
7
8