System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
228
SI Installation and Upgrades
June 2004
28
Interconnect Port Networks - Dual cabinet (EPN) upgrade only [75 XE upgrade]
29
Install ground plate(s) [75 XE upgrade]
(skip this step if Earthquake protection is used)
30
Install cabinet clip(s) [75 XE upgrade]
(skip this step if Earthquake protection is used)
31
Verify TDM cables and connectors [75 XE upgrade]
. If new TDM terminators and cables are
required but have not yet been installed, install them now.
32
Connect power and grounding and the SAT terminal [75 XE upgrade]
33
Close PPN stack without earthquake protection [75 XE upgrade]
or
Close PPN stack with
earthquake protection [75 XE upgrade]
34
Install cable clamps [75 XE upgrade]
35
Power up and set date, time, and daylight savings rule [75 XE upgrade]
36
Enable customer options and alarm origination [75 XE upgrade]
(You identify the upgrade as R7
or R8 here.)
37
Verify the upgrade [75 XE upgrade]
Restore any customer-placed busy-outs before you run the acceptance tests!
38
Run acceptance tests [75 XE upgrade]
39
Retranslate port circuits [75 XE upgrade]
if necessary
40
Readminister translation [75 XE upgrade]
if necessary
41
Rerecord announcements [75 XE upgrade]
42
Save announcements and translation [75 XE upgrade]
43
Register the upgraded switch [75 XE upgrade]
44
Return equipment to MSL [75 XE upgrade]
Verify the required hardware [75 XE upgrade]
Return to Task List
This equipment must be on-site before the upgrade begins. Ensure that the translation memory card is
current and, if necessary, contains 4 Mbytes of memory.
The TSC cannot source equipment for you.
To place a claim for missing equipment as part of the Streamlined Implementation process, call 1-800-
772-5409 and respond to the call prompter, or call the number provided by your Avaya representative.