Install Fiber Optic Cable Pass-Thru Kit for MCC1 (Multicarrier) Cabinets
Install the fiber optic cable pass-thru kit (MCC1)
178
SI Installation and Upgrades
June 2004
3
Determine which slot (1 or 2) will contain the new fiber optic circuit pack. Remove the circuit
pack or the blanking plate from this slot.
NOTE:
If a circuit pack is removed from the required slot, it must be installed into a different slot
in the cabinet. All translations associated with this circuit pack must also be moved.
4
Remove the circuit pack or the blanking plate from the slot next to the slot determined in
Step 3
.
Two consecutive open slots are required to install the fiber optic adapter.
NOTE:
If a circuit pack was removed in
Step 4
, it will be replaced into the same slot in the next
procedure.
5
Install the new circuit pack.
6
Open the rear door.
7
From the rear, remove the I/O cable connector plate associated with the slot that will contain the
new fiber optic circuit pack. See
Figure 11, Remove the I/O cable connector,
on page 180.
8
Using a supplied cable tie, secure the removed I/O connector to nearby cabling. See
Figure 12,
Secure the I/O cable connector,
on page 181.
9
From the front, remove the fan cover. See
Figure 13, Remove the fan cover,
on page 182.
Figure 10: Fiber pass-thru kit equipment
Figure notes
1
Pass-thru Tool
2
SC-SC Fiber Optic Adapter
3
ST-SC Fiber Optic Adapter
4
Fiber Optic Cable (Multimode or Single-
mode)
5
Fiber Optic Cable Disconnect Label
6
I/O Connector Adapter Bracket
7
Cable Tie
8
Cable Tie Mount
indapkit RPY 012398
1
2
3
4
5
6
7
8