System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
SI Installation and Upgrades
313
June 2004
Figure 85: Locations of ground plate, earthquake front plate, and battery
Return to Task List
Install cable clamps [75 small upgrade]
Return to Task List
Behind the cabinets using screws provided, install two cable clamps on each ground plate (see
Figure 86
).
These clamps are used to hold the port cables.
FRONT
EARTHQUAKE
PLATE
GROUND
PLATE
BATTERY
SIDE VIEW
2-CABINET PORT NETWORK