R5/R6/R7/R8si to Avaya Communication Manager
Task List: R5/R6/R7/R8si to Avaya Communication Manager
126
SI Installation and Upgrades
June 2004
Verify software version [from R5/R6/R7/R8si]
Return to Task List
Standard Reliability
1
Type
list configuration software-version
and press Enter to verify the system software version
(see the Memory Resident field).
High or Critical Reliability
1
Type
list configuration software-version
long
and press Enter to verify the system software
version (see the Memory Resident field).
Restore busyouts [from R5/R6/R7/R8si]
Return to Task List
1
Restore any busyouts that you removed in the
Verify system status [from R5/R6/R7/R8si]
section
prior to the upgrade.
Re-enable scheduled maintenance and alarm
notification [from R5/R6/R7/R8si]
Return to Task List
1
Type
change system-parameters maintenance
and press Enter.
2
Enable the scheduled daily maintenance.
3
If you changed the
Start Time
or
Stop Time
field, change it back to the original time.
4
Re-enable alarm notification.
Check customer options [from R5/R6/R7/R8si]
Return to Task List
High or Critical Reliability
1
Verify that the switches are in auto: Type
status system 1
and press Enter.
Verify that conditions are normal (this can take as long as 5 to 10 minutes). If the system refuses
to go onto a normal condition, refer to the maintenance procedures; if that fails, escalate the
problem.