Install and Connect MCC1 (Multicarrier) Cabinet
Task List: Connect AC power and ground
336
SI Installation and Upgrades
June 2004
NOTE:
The type of power required is shown on the cabinet’s rear door.
Grounding an AC-Powered System
(J58890CE)
Grounding is relatively simple for an AC-powered system. Basically, the cabinets connect to the single-
point ground terminal block located at either the AC load center or to a separate single-point ground
block wired to the AC load center (or optional AC protector cabinet).
•
The approved ground wire must be a green (or green with yellow stripe), 6 AWG (#40) (16 mm
2
),
copper, stranded wire.
•
Bond all approved grounds at the single-point ground to form a single grounding electrode
system.
Ground AC Load Center 50 ft (15.2 m) or Less from Cabinet
Return to Task List
1
At the bottom rear of the PPN cabinet, connect a 6 AWG (#40) (16 mm
2
) CABINET GROUND
wire to the cabinet ground terminal block. See
Figure 89, Typical Cabinet Ground Location,
on
page 337.
2
Route the CABINET GROUND wire to the single-point ground block at the AC load center and
connect.
3
At the bottom rear of the first EPN cabinet (if provided), connect a 6 AWG (#40) (16 mm
2
)
CABINET GROUND wire to the cabinet ground terminal block.
4
Route the CABINET GROUND wire to the single-point ground block at the AC load center and
connect.
NOTE:
If the EPN cabinet is located remote from the PPN cabinet (in a separate room or
building), connect the CABINET GROUND wire to an approved ground.
AC Power Sources and Plug Type
Power Distribution Unit
Power Sources
Power Input
AC power distribution
(J58890CE-1 and J58890CE-2)
Multi-Carrier Cabinet
Single-phase 120 VAC with
neutral
Single-phase 240 VAC with
neutral, or single phase of 3-phase,
208 VAC with neutral
120 VAC, 60 Hz
NEMA 5-50R
208-240 VAC, 60 Hz
NEMA L14-30R
AC power distribution
(J58890CH-1) Multi-Carrier
Cabinet
Single-phase 176-264 VAC
200-240 Volts, 50-60
Hz NEMA L6-30R.
Installations outside
the United States
require a receptacle
suitable for use in the
country of
installation.