UPS Installation for SCC1 EPN A-Carrier Cabinet
Task List: Install UPS
788
SI Installation and Upgrades
June 2004
Figure 304: UPS for Fiber-Remoted SCC1 EPN
Figure notes
1
110 cross-connect field
2
Utility fail wire pair
3
UPS fail wire pair
4
700A8 (RJ45) modular plug (see
Wire
the 700A8 Plug
on page 786 for wiring
detail)
5
Z3A2 UPS alarm adapter plugs into DB25
connector
6
UPS 800/1000VA
7
EPN control carrier
8
See
Figure 306, Enlarged View of the 110
Cross-Connect Field for the AUX
Connector,
on page 790 for wiring detail
2
1
5
6
7
8
4
3
9
10
AUX
EPN
Control carrier - J58890N
Port carrier - J58890H
Port carrier - J58890H
C
B
A
cydfups4 KLC 092899
6
5
2
1
6
7
8
1
2
3
4
5
6
7
8